Free delivery in Ibadan

Ibadan solar planning & installation

Solar installation designed around your actual load.

Leaf Solar helps customers in Ibadan move from an appliance list and site details to a written, project-specific solar quotation. Calculator results and catalogue packages remain planning aids until the load, equipment and installation scope are confirmed.

A clear project path

From appliance list to confirmed scope

A useful solar proposal explains what the system is intended to power, the equipment included and the site work covered. These steps keep that information visible.

01

Define the load

List the appliances, ratings, quantities, operating hours and loads that may run together. Separate essential from optional loads.

02

Review the site

Share relevant site details, photographs or arrange an assessment when needed to review space, shading, routes, access and installation conditions.

03

Confirm the scope

Review a written quotation identifying equipment, quantities, installation work, price and the assumptions that apply to the project.

04

Install and hand over

Project timing is agreed for the specific scope. Handover should identify installed equipment and the operating, safety or maintenance guidance provided.

What the design considers

Equipment choices follow the requirement.

Inverter output is only one part of the design. Daily energy, starting demand, battery storage, solar input, site conditions and electrical scope must work together.

Read the complete sizing guide →
Appliance load
Actual ratings, quantities, hours and simultaneous use.
Battery storage
Desired backup period and product-specific operating limits.
Solar array
Equipment input limits, mounting space, orientation and shading.
Site scope
Cable routes, equipment location, access and distribution work.
Product fit
Confirmed inverter, battery, panel and protection compatibility.
Future use
Known load additions or expansion requirements discussed in advance.

Different sites, specific loads

Plan for how the property is actually used.

Homes

Plan around essential household loads, desired backup time, daytime use and the appliances that need to start together.

Shops and offices

Document operating hours, work equipment, refrigeration, connectivity and any loads that affect business continuity.

Larger requirements

Commercial or industrial package names are only starting points; actual loads and site conditions must be confirmed.

Before you approve a project

Ask for the details in writing.

  • The equipment models and quantities included.
  • The appliance loads and operating assumptions used for sizing.
  • The installation, mounting, cable, protection and distribution work included.
  • Any site, access or third-party-work assumptions.
  • The project-specific timing and payment stages that apply.
  • The product and workmanship warranty terms confirmed for that project.
Read the solar installation policy →